US Army Corps of Engineers - Belleville Dam
This project included environmental controls, lead abatement, abrasive blasting and coating application on eight bulkheads for the Belleville Dam.
We installed and erected a type 1 containment system equipped with a dust collection system. To access project areas 45 feet above the Ohio River, we also engineered and erected a false flood under the dam bulkheads.

